Kitchen Fitting Nottingham | XPB Construction Skip to content

Renovate

Kitchen fitting in Nottingham

XPB Construction fits kitchens across Nottingham and Nottinghamshire, from straight replacements to knock-throughs that turn a closed kitchen into an open-plan family room.

What kind of kitchen job is it?
  • Like-for-like replacement in the same layout
  • New layout, island or knock-through into the dining room
  • Kitchen as part of an extension
Bought your kitchen already? We fit supplied kitchens too.

10/10 on Checkatrade from 9 reviews · 15 years of experience · Based in Stapleford

Sage green kitchen island in an open-plan extension

Recent kitchen projects

10/10 on Checkatrade

“Hyso and his team made the upheaval of having kitchen renovations so much easier to deal with. Budgets and costs were clearly discussed and explained. Top class job.”

Building work and fitting by one team

A kitchen fitter fits units. A new kitchen often also needs walls removed, pipes and drains moved, new circuits, plastering, flooring and tiling. We do all of it, in the right order.

We fit kitchens from the big suppliers and local makers, or one you have bought yourself. Hyso Kasaj measures, checks the layout and runs the job.

The quote lists the building work and the fitting separately, so you can see where the money goes.

What is included

  • Strip-out and disposal of the old kitchen
  • Knock-throughs and steel beams if needed
  • Plumbing and waste moved to the new layout
  • New electrical circuits and lighting
  • Plastering and making good
  • Unit, worktop and appliance fitting
  • Splashbacks and wall tiling
  • Flooring
  • Decoration
  • Building control where structural work is involved

Timescale and cost

A like-for-like kitchen typically takes 1 to 2 weeks. A new layout with a knock-through takes 3 to 5 weeks. We set up a temporary sink or kitchen where we can.

As a guide, kitchen installation including electrics, plumbing, tiling and decoration works out at around £1,400 per m² of room in Nottinghamshire. Units, worktops and appliances are extra. Use the cost calculator for a range.

What moves the price:

  • Like-for-like or a new layout
  • Walls removed and steels needed
  • How far plumbing and waste move
  • Worktop material: laminate, quartz or stone
  • Flooring and tiling chosen

Building regulations and safety

Most kitchen replacements need no planning permission. New electrical circuits must meet Part P and are certified. Gas hobs and boilers must be connected by a Gas Safe engineer.

Removing a load-bearing wall needs structural calculations and building regulations approval. We arrange the engineer, the steel and the building control inspections.

Extractor ducting, ventilation and fire safety near the hob are checked as part of the design. Nothing on this page is legal advice.

Kitchen projects we do

From a quick replacement to a full open-plan rebuild.

Fitted kitchen with dark units

Replacement kitchen

New units and worktops in the existing layout, fitted in one to two weeks.

Open-plan kitchen-diner

Knock-through

A wall removed to join kitchen and dining room into one space.

Kitchen island on dark flooring

Island kitchen

A central island with seating, power and sometimes a sink or hob.

Kitchen extension with breakfast bar

Kitchen extension

A new kitchen as part of a rear or side extension.

Built to last, built responsibly

A kitchen that wastes less

We recycle old units and worktops where possible, fit LED lighting as standard and can advise on efficient appliances and better insulation while walls are open.

  • Lower billsInsulation above the minimum where it pays back.
  • Local materialsWe buy from local Nottinghamshire merchants.
  • Less to landfillWe sort waste on site and send it for recycling with a licensed carrier.

Questions people ask about kitchens

Do you fit kitchens I have bought myself?

Yes. We check the plan and delivery before fitting.

Can you remove the wall between kitchen and dining room?

Yes. We arrange the structural engineer, steel beam and building control sign-off.

How long will I be without a kitchen?

Usually 1 to 2 weeks for a replacement. We can set up a temporary sink.

Do you do tiling and flooring too?

Yes, so one team finishes the whole room.

Plan your new kitchen

A free site visit to measure up and talk through the layout, then a written quote.