House Extensions Nottingham | XPB Construction Skip to content

Extend

House extensions in Nottingham

An extension gives you the kitchen-diner, playroom or extra bedroom you need without the cost of moving. XPB Construction builds extensions across Nottingham and Nottinghamshire, from footings to a room ready to decorate.

Is an extension right for your house?
  • Space at the back or side of the house: usually yes
  • Single-storey rear extensions are often permitted development
  • Guide price from around £35,000 for a single-storey rear extension
Not sure what is allowed? We check at the free site visit.

10/10 on Checkatrade from 9 reviews · 15 years of experience · Based in Stapleford

Finished single-storey rear extension with rooflights and new patio

Recent extension projects

10/10 on Checkatrade

“Had an extension done at the back of the house by them and can’t be more happy with their work. Highly recommend.”

More room, same postcode

Most of the extensions we build are single-storey rear extensions on semis and terraces, opening a small kitchen into a bright kitchen-diner with bifold doors and rooflights. We also build side returns, wraparounds and double-storey extensions.

One team handles the whole build: footings and drainage, brickwork, steels, roof, windows and doors, insulation, plastering, electrics, plumbing and the kitchen. Hyso Kasaj runs the job and is on site throughout.

If a design will not work on your plot or is unlikely to get planning, we tell you at the visit, before you pay for drawings.

What is included

  • Drawings, structural calculations and steels arranged
  • Footings, drainage and slab
  • Brick and block walls to match the house
  • Flat or pitched roof, rooflights or lantern
  • Bifold, sliding or French doors and windows
  • Insulation to current building regulations
  • Plastering, electrics, heating and plumbing
  • Kitchen fit and flooring if wanted
  • Building control applications and sign-off
  • Skip, waste removal and a daily tidy

Timescale and cost

A single-storey rear extension typically takes 10 to 14 weeks on site. A double-storey extension usually takes 14 to 20 weeks. You can normally stay in the house, with a temporary kitchen set up while the back wall is opened.

As a guide, single-storey extensions in Nottinghamshire work out at around £2,200 per m² for a mid-range finish, so a 15 to 30 m² extension is roughly £35,000 to £65,000. Use the cost calculator for a range on your size.

What moves the price:

  • The size and number of storeys
  • Roof type: flat, pitched or with a lantern
  • Glazing: bifolds, sliding doors and rooflights
  • Ground conditions and drain runs under the footprint
  • The kitchen and finishes you choose

Planning permission and building regulations

Many single-storey rear extensions are permitted development, within limits on depth and height. Larger rear extensions can go through the prior approval route. Side, wraparound and double-storey extensions usually need a planning application, and conservation areas have tighter rules.

Every extension needs building regulations approval, covering foundations, structure, insulation, drainage and fire safety. We submit the application, arrange the inspections and hand you the completion certificate.

If you build on or near a shared boundary, a party wall notice is usually needed. We check each project individually. Nothing on this page is legal advice.

Types of extension

The right type depends on your plot, the layout you want and your budget. We look at the options with you at the free site visit.

Kitchen extension with bifold doors to the garden

Single-storey rear

The most common extension in Nottingham. Opens the back of the house into a kitchen-diner with doors to the garden.

Open-plan kitchen-diner in a widened extension

Side return

Fills the narrow strip beside a terrace or semi to widen the kitchen. Often combined with a rear extension.

Large open-plan extension with rooflights and sage kitchen

Wraparound

An L-shaped extension across the back and side. Gives the biggest ground-floor space and usually needs planning.

Brick and block walls going up on a new extension

Double-storey

Adds space downstairs and a bedroom or bathroom upstairs, for less per m² than two separate projects.

Built to last, built responsibly

Warm in winter, cool in summer

Big glass doors and rooflights can make an extension hard to heat. We insulate floors, walls and roof above the regulation minimum where it pays back, specify good glazing and seal the junctions with the existing house properly.

  • Lower billsInsulation above the minimum where it pays back.
  • Local materialsWe buy from local Nottinghamshire merchants.
  • Less to landfillWe sort waste on site and send it for recycling with a licensed carrier.

Questions people ask about extensions

Do I need planning permission for an extension?

Many single-storey rear extensions are permitted development. Side, wraparound and double-storey extensions usually need planning. We check your house at the site visit.

Can I stay in the house during the build?

Usually yes. Most of the work happens outside until the back wall is opened. We plan a temporary kitchen and keep the house weathertight.

Who draws the plans?

We work with a local architectural designer and structural engineer and can arrange both, or build from your own drawings.

How long does an extension take?

A single-storey rear extension typically takes 10 to 14 weeks on site, after drawings and approvals are in place.

Do you fit the kitchen too?

Yes. We can supply and fit the kitchen, flooring and decoration so one team finishes the whole room.

Find out what your extension will cost

A free site visit takes about an hour. We look at the space, talk through the layout and send a written quote.