House Refurbishment Nottingham | XPB Construction Skip to content

Renovate

House refurbishment in Nottingham

Whether it is one tired room or a whole house you have just bought, XPB Construction refurbishes homes across Nottingham and Nottinghamshire with one team managing every trade.

Is a refurbishment what you need?
  • Dated kitchen, bathroom, floors or decoration
  • Just bought a house that needs work before you move in
  • Rewiring, replastering or new heating needed
Not sure where to start? We walk round with you at the free site visit.

10/10 on Checkatrade from 9 reviews · 15 years of experience · Based in Stapleford

Refurbished interior with new flooring, doors and paintwork

One team for every trade

A refurbishment usually means plastering, electrics, plumbing, joinery, flooring and decoration all in the right order. We plan the sequence and run it, so you are not chasing five separate trades.

We refurbish 1930s semis, Victorian terraces, new-build homes that need updating and rental properties between tenants. Hyso Kasaj runs every job and is on site throughout.

You get an itemised written quote, so it is clear what is included and what is a provisional sum.

What is included

  • Strip-out and waste removal
  • Rewiring and new consumer unit
  • Heating and plumbing alterations
  • Plastering and skimming
  • Internal doors, skirting and architrave
  • Kitchen and bathroom fitting
  • Flooring: wood, LVT, carpet and tiles
  • Painting and decorating
  • Knock-throughs and structural openings
  • Daily tidy and dust protection

Timescale and cost

A single room takes 1 to 3 weeks. A full refurbishment of a three-bed semi typically takes 8 to 14 weeks.

As a guide, a full refurbishment in Nottinghamshire works out at around £900 per m² for a mid-range finish, so a 90 m² three-bed semi is roughly £80,000. Single rooms are priced individually. Use the cost calculator for a range.

What moves the price:

  • How much is stripped back: decorate, replaster or rewire
  • Whether a kitchen or bathroom is included
  • Structural changes such as knock-throughs
  • Condition found once walls and floors are opened
  • The finishes you choose

Building regulations and surveys

Most refurbishment work does not need planning permission. New electrical circuits, consumer units and work in bathrooms must meet Part P and be certified. Heating and gas work must be done by Gas Safe engineers.

Removing walls, changing drainage or replacing windows can bring in building regulations. We tell you what applies and arrange the notifications.

In older houses we often find hidden issues such as damp, rotten joists or old wiring. We show you before quoting any extra. Nothing on this page is legal advice.

Types of refurbishment

Every refurbishment is different. These are the jobs we do most often.

Refurbished hallway with new doors

Whole-house refurbishment

Everything from rewiring to decoration, often before you move in.

Refurbished living room with new flooring

Single room

A living room, bedroom or hallway brought up to date in one to three weeks.

Kitchen with marble tiling

Kitchen and bathroom

The two rooms that change how a house feels most.

Freshly painted room with new skirting

Rental refresh

Fast turnarounds between tenants, with certificates sorted.

Built to last, built responsibly

A refurbished house that costs less to run

While walls and floors are open it is the cheapest time to insulate, draught-proof and upgrade the heating. We point out where it pays back and recycle as much of the strip-out as we can.

  • Lower billsInsulation above the minimum where it pays back.
  • Local materialsWe buy from local Nottinghamshire merchants.
  • Less to landfillWe sort waste on site and send it for recycling with a licensed carrier.

Questions people ask about refurbishment

Can I live in the house during a refurbishment?

Often yes, room by room. For a full refurbishment with rewiring, many clients move out for part of the job.

Do you handle electrics and plumbing?

Yes, with qualified electricians and Gas Safe engineers, and certificates at the end.

What if you find problems once work starts?

We stop, show you, and price the fix before carrying on.

How long does a full refurbishment take?

A three-bed semi typically takes 8 to 14 weeks.

Plan your refurbishment

Walk round with us at a free site visit. We note what you want and send an itemised written quote.